February 26th. Two more days for Finish it February projects!
Boston has had record breaking snowfall this winter, most of the snow falling this month. I'd had visions of sitting in my sewing room, happily quilting while snow gently swirled outside the window. In reality, I was outside dealing with the snow! Daily chores included shoveling walks, brushing snow off the roof and working to keep leaks from the attic to a minimum. The dogs, on the other hand, have been having a great time playing in the mountains of snow in the yard! As they say, a tired dog is a good dog. Three sleeping dogs makes concentrating on quilting easier!
All the hours spent dealing with the snow meant there was far less time for quilting than I had expected, But it looks like I'll still be able to complete 5 of the 6 quilts in my stack!
Here are details of the two twin sized quilts. The photos show some of the quilting and I've flipped a the edge of the quilts over to show the backing.
I'll post a gallery of all the finished quilts next week!